Monday, February 23, 2009

February 23rd, Cabinets are installed, mostly.

Kitchen cabinets


Upstairs bath

Loft Cabinets

Bathroom
Cabinets above the Washer and Dryer
Cabinents opposite the Washer and Dryer




February 21st, Tile floors are put in






Sunday, February 15, 2009

Feb. 14th 2009

Garage Doors are in.


Walls are taped, mudded and textured.
We spent a while going through and measuring all of the windows so that we can start pricing out the different kinds of blinds that we want to put throughout the house.
The spots are where the walls are textured, or lack of texture actually.
The ceilings also have a nice knock-down texture to them.

Sunday, February 8, 2009

February 7th, 2009



Preparing to pour the driveway.

Drywall is up all through the house!